STAGE 04 · INCIDENT RESPONSE & POST-DISASTER TRIAGE

RAKSHA: Automated
Risk Alerting & Triage

The emergency response protocol of the SASA PRATIBIMBHI digital twin platform. Instantly generates sub-60-second incident dispatches, autonomous 2-minute post-earthquake safety clearances, and certified structural integrity audit certificates across municipal portfolios.

Sub-60s Incident Dispatch

Multi-channel push across encrypted webhooks, SMS, WhatsApp, and emergency operations center (EOC) REST endpoints.

Dispatch SLA: < 60 Seconds

2-Min Post-Event Triage

Immediate structural triage clearances following earthquakes, classifying buildings into Green (Safe), Yellow (Inspect), or Red (Evacuate).

Clearance: < 2 Minutes

Lifeline Prioritization

Prioritizes critical lifeline assets: ICU hospitals, arterial viaduct bridges, water treatment plants, and emergency responder dispatch stations.

Integrations: SDMA & NDRF

Audit Certificates & Proof

Immutable, cryptographic sensor hash logs providing tamper-proof evidence for municipal audits and parametric catastrophe reinsurance claims.

Standard: IS 1893 Verified
RAKSHA COMMAND CENTER V2.4

Live Post-Disaster Triage & Incident Dispatch

Select a simulated seismic event intensity and inspect real-time lifeline triage ratings, SLA clearance velocities, and multi-channel emergency dispatches.

SEISMIC INTENSITY:
ACTIVE LIFELINE ASSET QUEUE (3 MONITORED)● LIVE MESH LINKED
HOSP-SZ-804District Emergency Hospital Wing
8-Story Base-Isolated Hospital · Seismic Zone V (Himalayan Belt)
TIER 1: CLEAR
Peak Dynamic Strain142 με
Modal Shift-3.8%
Clearance SLA48 Seconds
Priority Rank#1
Action: Immediate Unrestricted Operational Clearance
INFRA-VD-112Metropolitan Viaduct Pier #14
Pre-stressed Box Girder Arterial Bridge · Seismic Zone IV (Delhi-NCR)
TIER 2: INSPECT
Peak Dynamic Strain440 με
Modal Shift-11.2%
Clearance SLA1.4 Minutes
Priority Rank#2
Action: Halt Heavy Freight Traffic / Limit to 20 km/h
ULB-MC-409Municipal Civic Complex Tower A
12-Story Reinforced Concrete Shear Core · Seismic Zone IV
TIER 1: CLEAR
Peak Dynamic Strain210 με
Modal Shift-4.2%
Clearance SLA54 Seconds
Priority Rank#3
Action: Structure Safe for Normal Civic Occupancy
DISPATCH WEBHOOK ENGINE
{
  "event": "RAKSHA_POST_DISASTER_TRIAGE",
  "version": "2.4.0",
  "protocol": "SASA_EMERGENCY_DISPATCH_IS1893",
  "timestamp": "2026-08-23 16:34:15 UTC",
  "asset_id": "INFRA-VD-112",
  "asset_name": "Metropolitan Viaduct Pier #14",
  "seismic_zone": "Seismic Zone IV (Delhi-NCR)",
  "peak_ground_acceleration_g": "0.38g",
  "telemetry": {
    "peak_microstrain": 440,
    "modal_frequency_shift": "-11.2%",
    "yield_threshold_exceeded": false
  },
  "triage_decision": {
    "status": "YELLOW",
    "action": "Halt Heavy Freight Traffic / Limit to 20 km/h",
    "clearance_sla_seconds": 60,
    "re_entry_clearance": true
  },
  "recipients": [
    "https://ndrf.gov.in/api/v1/structural-triage",
    "https://delhi.gov.in/sdma/dispatch-webhook",
    "https://reinsurance.internal/claims/cat-proof"
  ]
}
STATUTORY COMPLIANCE

Certificate of Structural Integrity

Generate instant certified PDF audit documents for municipal commissioners, PWD boards, and reinsurance claims.

MUNICIPAL DISASTER MITIGATION DEPLOYMENT

Deploy RAKSHA Protocol on
High-Risk Asset Portfolios

Equip urban local bodies, disaster mitigation squads, and bridge authorities with automated sub-2-minute post-earthquake triage. Integrated directly with state disaster management dashboards and emergency responder channels.

ENTERPRISE BRAND HIERARCHY
CogniStruct Pvt. Ltd.SASA EngineersSASA PRATIBIMBHI